Thursday 12 July 2012

July 9th, 2012 – John and Deb’s Place - Carvel Ab


July 9th, 2012 – John and Deb’s Place - Carvel Ab
Weather – Sunny, clear and hot
Total Mileage this trip - 2578.0                                   Mileage today -                0

This morning it was the guys time to get up and go early.  We were off to find a headlight swith, Pick-a-part.  We got two switches for $10.00 (late 80’s chev).

Wow, another hot day, it seems the best time to do work outside is either in the morning or later in the evening.  However, in John’s shop, it seems to stay a nice 71 degrees F.  It is really pleasant to work in.
Temp in greenhouse - 42C or 108F
John Reynolds
Then off to get some metal for the dash – make a new panel where the stereo and mirror controls are going to go. We had the metal sheared for us, so it looks and fits nicely. For this same project, off we went to purchase wire, connectors, etc. for this same project.


We cut the holes in for the stereo, mirror controls and ignition key.  We used JB Weld for holding the bracket onto the aluminum (John is a genius LOL)  I had never heard of this glue/weld before but it sure seems to work good.

Once this was made, we went to work on the coach.  The headlight switch was installed, but for some unknown reason, there was a lot of current on it, we could hear it sizzle.  It was disconnected and we traced everything we could but could not find the reason, but now it seems to work properly.  We however redid some of the wiring, so now the low air and headlight warning lights and buzzer works like it should.

We played with the step control circuit and found the mercury switch out of adjustment, so this was repaired as well. 

Success all around.

No comments:

Post a Comment